Study on the Interconnection of the Electricity Networks of the Nile Equatorial Lakes Countries Feasibility Report Volume 4 B – Burundi-Rwanda Interconnection Environmental and Social Impact Assessment Report

This study is carried out in the frame of the interconnection of the electricity networks of the Nile Equatorial Lakes Countries under the Nile Equatorial Lakes Subsidiary Action Program (NELSAP). The sectoral objective of this study is to improve the rate of access to electrical power for the peoples of the Equatorial Nile Basin.

The main focus in this volume is on Burundi- Rwanda interconnection, where a feasibility study is developed.

A French version is available for French speakers.